澳门捕鱼赚钱游戏(中国)集团官网

Power Monitors

Real-time power consumption monitoring is the first step to saving energy. Learning real-time power consumption by monitoring your system is the first step in saving energy.
Reduces power equipment costs, supports energy saving laws and ISO14001, and helps the digitalization of power monitoring from the manufacturing site to the office.

Yokogawa Electric offers broad solutions using power monitoring.

Installation Panel mounting such as switchboards Installation in the board
DIN rail/a wall
Install without turning off the power
Model PR720
PR720
UPM100/UPM101
UPM100/UPM101
CTW series
CTW Series
Appliations Power equipment meter
Energy saving monitor
Energy saving monitor Clamp-on Current Transformers

>> Click here for an example solution

  • CTW

    The CTW Series are clamp-on current transformers that can be installed much easier than conventional current transformers, whereby saving installation cost.

    See More

Details

Reduce power costs, supports the Energy Conservation Act and ISO14001, and as power equipment,
Aids the digitalization of power monitoring from the factory to the office.

Broad power monitoring-based solution system

Downloads

General Specifications
  • List of EU RoHS Directive “2011/65/EU+(EU)2015/863” (10-Substances) Compliant Recorder and Controller Products (324 KB)
  • List of RoHS (2011/65/EU) Directive Compliant Products (6-substances RoHS compliant products) (356 KB)

Looking for more information on our people, technology and solutions?

Contact Us

Top
高台县技术转让有限公司和县电线电缆有限公司元宝区室内装潢设计咨询有限公司永泰县电线电缆有限公司石门县货运代理有限公司 潘集区音响设备有限公司云龙区玻璃制品有限公司清苑区机械设备安装有限公司乌恰县美术设计有限公司 徽县制作有限公司